Sizes in mm
Gable apex storage
From £2,058 inc VAT, made to your size
Delivery from £59, free over £750 near us. Check your postcode
until you sign it off
in our own van
your exact piece
for 5 years
How it can look.
Storage for a gable wall that comes to a point
A gable wall is the triangle at the end of a loft room, and it's the hardest wall in the house to furnish. This piece fills it, with the two tallest sections meeting under the highest point and the rest stepping down towards each side. The point doesn't have to be in the middle.
Each door is made to the slope above it, so the fronts follow the shape of your roof. With a flat part in the middle of the ceiling, choose gable storage with a flat ceiling instead. It's part of our range for eaves and lofts, and it works well in a loft bedroom, with knee-wall storage along the low walls.
Twenty colours, twelve doors.
And eleven handles, or push to open where the doors allow it. Colours never look the same on a screen, so hold them in your hand before you choose.
Your gable apex storage, your sizes.
| Width | 300 to 5,500mm |
| Heights | The top of the apex and each low end, from your measurements |
| Depth | 160 to 653mm |
| Sections | Set automatically from the width, or choose |
| Inside | Per section: shelves, a rail, rail with shelves below |
| Fitted or freestanding | Fitted only |
These are the widest ranges we make. The exact range depends on your other choices, and the design tool shows it as you go. If anything you choose won't work, the page tells you why and what to change, before you order.
Built in.
Fitted: give us the opening, wall to wall. We make the piece to slide in and send oversized infill panels that you trim to your walls, so it looks built in.
Made for eaves and lofts and bedrooms.
Measuring up for your gable apex storage.
In millimetres, in three places, and give us the smallest. Play the film, or tap a step to see how.
- WidthWall to wall, just above the skirting, in the middle and at the top. Give us the smallest.
- Height at the left wallFloor to where the slope meets the wall on the left.
- Height at the apexFloor to the highest point of the roof, beside the plumb line.
- Width of the left slopeHang a plumb line (a weight on a string) from the highest point, pencil the wall where the string hangs, and measure along the wall from the left wall to the mark.
- Height at the right wallFloor to where the slope meets the wall on the right.
- DepthMark the floor where you want the front, stand a book on the mark and measure from the wall to the book, above the skirting.
- SkirtingPress a book flat against the skirting and measure from the wall to the book. No skirting? That's a 0.
What happens next.
Pay for your design. Nothing is cut yet, and you can still change it or cancel for a full refund.
A person looks over every design, and gets in touch if anything looks odd.
The full specification, sizes and all, and you pick your delivery day.
In our own van, on your day.
Labelled panels and a video of your exact piece.
Building your gable apex storage.
Most pieces go up in an afternoon, built standing up so nothing needs lifting over your head. You'll need a screwdriver, a mallet, a spirit level and a drill for fixing it to the wall, plus a saw for trimming the infills.
- A code on every panel
- A video of your exact design
- Every screw and wall plug in the box
Made to measure, without the worry.
Nothing cut until you confirm
We look over every design, and you check and sign off the full specification before we cut. Until then, change it or cancel for a full refund.
Room for real walls
We allow 30 to 50mm at each wall so a fitted piece slides in, and send oversized infill panels that you trim to close the gap.
3 to 4 weeks from sign-off
Cut to order once you've signed it off, then brought to your door in our own van, not a courier's. You choose the day.
Questions about your gable apex storage.
What if the point isn't in the middle?
That's fine. Measure from the left wall to the highest point and we set the steps from there; each side follows its own slope.
Does it have to fill the whole wall?
Between the two walls, yes: both ends are low, so they always go against a wall.
Are the doors cut to the slope?
Yes. Each door is made to the slope by our door maker, in any style. The two in the middle hinge on the upright under the apex.
Is it hard to build?
If you've built flatpack before, you can build this, and we've made it easier than the flatpack you're used to. You get a video of your exact piece going together, at your sizes, and every panel has a code to match. Watch an example.
What tools do I need?
Nothing specialist: a screwdriver, a mallet, a spirit level and a drill for fixing it to the wall, plus a saw for trimming the infills. All the fittings are in the box.
What if I measure wrong?
Measuring is easier than it sounds: our guide shows you exactly where to put the tape, and a fitted piece has room built in for walls that aren't straight. We check that your design can be made, but we can't see your room, so measure twice. You check every size again before you sign off, and nothing is cut until you do.
How long does it take to arrive?
Usually 3 to 4 weeks from the day you sign off your design. Every piece is cut to order, so we can't start until you've confirmed it. You pick the delivery day, and we bring it in our own van.
Can I see the colours first?
Yes, and we'd recommend it. Our sample pack has a swatch of every door colour and a block of the board itself, so you can see them in your own light. It's £5 delivered, and that comes off your first furniture order.
You may also like.
Tall cupboard
Full-height doors: shallow for halls, deeper for everything else.
Stepped shelving
Freestanding open shelves that step down under the stairs or a sloping roof.
Knee-wall storage
Cupboards against the low wall of a loft room, cut to the angle of the roof.
Storage under a flat ceiling, slope to the left
Full height under the flat ceiling, stepping down where the roof slopes to the left.
Ready when you are.
Email your design to yourself and come back to it any time. We hold the price for 30 days, and nothing is cut until you sign it off.